1 | Can the two generators (switching) charge the batteries through the Xtender Hybrid Charger/Inverter? | Yes, the Xtender Hybrid Charger/Inverter has two programmable input relays through which two generators can be controlled. |
2 | Xtender series inverter is in parallel with the generator. How to set up the generator when the power is low? | The relay can be programmed to start the generator when the battery voltage is lower than the set value, or AUX can be set to low voltage alarm to start the generator. |
3 | Why is the BSP measured at 0.2a when the inverter is at 0A? | It is possible for BSP to display 0.2a when the inverter is at 0A, because the inverter itself consumes power. |
4 | Can the BMV-700 have an extended signal light that lights up during an alarm? | Yes, the BMV-700A has two relay output contacts, which can be programmed. |
5 | Can the maximum charging voltage of PWM controller be set to 12.3V? | No. |
6 | Is the PROsine LCD display available in stock? | Yes. |
7 | Xth6000-48 120V 60HZ how long the production cycle? | 7-10 Days. |
8 | Two XTM3500-24 units are connected in parallel to form a 6Kw output. If only 2Kw output, is there only one XTM 3500-24 working? If the output is 4Kw, how is the power distributed? | If the output is only 2Kw, one XTM 3500-24 is working and one is standby. If the output is 4Kw, the system will automatically allocate. |
9 | Is Xantrex Prosine Inverter still on sale? | Yes,and a small quantity. |
10 | Stude's R solar controller is damaged. Can we provide inspection and repair? | Yes,PCB needs to be mailed to us. |